CASE STUDY
Group photo of customers
Case Overview Bangladeshi customer Industry: Bubble flm Equipment models used The customer selected the following equipmentfrom our company this time Equipment model: Guotai 7-layer composite fullyautomatic bubble filmmachine Confguration: such as three screwers, seven-layer composite, fullyautomatic rewinding, PLC intelligent cabinet, edge material recovery system,etc.
Case Overview

Bangladeshi customer

Industry: Bubble flm

Equipment models used The customer selected the following equipmentfrom our company this time

Equipment model: Guotai 7-layer composite fullyautomatic bubble filmmachine

Confguration: such as three screwers, seven-layer composite, fullyautomatic rewinding, PLC intelligent cabinet, edge material recovery system,etc.

case-study
Client Background

However,the company is constrained by its outdated production equipment and is trapped in a triple predicament of insuficient production capacitly, high costsand unstable quality. it urgently needs to achieve breakthroughs through technological upgrades.Before the cooperation, the customers faced the following typical problemsInsuficient production capacity - The old equipment is slow, and often fails to deliver goods on timeduring peak seasons.High abor costs The automation level ofthe eauipment is ow, and operaions such as rewindingand cuting reguire muliple people to operate. resuling in ashortage of labor.

Unstable product ualty - There is a large eror in thickness, afecting the end customer experience,Severe waste ofleftover materals . The old eauipment has noleftover material recycling, andwastes raw materials every month.

High equipment failure rate - Freguent shutdowns, affecting the normal production rhythm.

case-study
Solution

In response to the customers" pain points, we haveprovided the followingsolutions:

By using our fully automatic bubble film machine.equipped with:

  • Intelligent PLC control system
  • Automatic cutting, automatic rewinding
  • High-precision screw + die head
  • Edge material recycling system
  • Multi-layer co-extrusion composite technology
Implementation Process
  1. March 10, 2025 - Equipment solution confirmed, contract signed
  2. April 1, 2025 - Equipment delivered to the customer's factory and installed
  3. April 3-5, 2025 - Commissioning + employee training
  4. April 6, 2025 - Official production start
  5. May 2025 - Production capacity significantly increased and enters stable mass production
Final effect

Actual benefits achieved

Production capacity increased by 30%-70%

Reduced labor costs by 2 -4 personnel

Improved product stability, with thickness error controlledwithin ±0.002mm

Reduced waste by 20%-35%

Stable delivery schedule, able to ship on time even duringpeak seasons

Shortened payback period within one year by 30%

case-study
Customer feedback

After using Guotai Machineny's composite fully automaic buble flm machine, the most obvious benefts we experienced were increased production capacityreduced labor costs, and more stable delivery times. Especialy the automatic rewinding and PLC system made the production process more continuous andstable. The overall equipment is very convenient to operate and has a fast after-sales response.t is highly recommended.

GET A QUOTE

Talk to Our Expert

Talk to Our Expert.
Captcha Code
GET IN TOUCH NOW
Captcha Code
We value your privacy
We use cookies to provide you with a better online experience, analyse and measure website usage, and assist in our marketing efforts.
Accept All